Standards and law

What NBR 5410, NBR 5419, NR-10 and NR-35 actually require of you

A working summary of the Brazilian standards and rules behind every electrical design and every technical inspection report: five points that matter per standard, who enforces them, what changes in your document, and the questions that most often arrive on WhatsApp. This is a practical reference, not legal text — for a decision with legal value, the current wording of the standard prevails.

NBR 5410 · low voltage NBR 5419 (ex-5418) · LPS NR-10 · electrical safety NR-35 · work at height
The standards behind the work

Five essential points per standard

Selected by what actually rejects a design at utility approval, fails a report at the fire marshal visit, or draws a labour-inspection citation.

01

NBR 5410 — Low-voltage electrical installations

The parent standard for building and industrial electrical design in low voltage: up to 1,000 V AC (and 1,500 V DC) below 400 Hz. The current published edition is still 2004 with amendments, and a full revision has been under way at ABNT since 2023 — so a properly built design today is already compatible with the new structure.

  • Design is a requirement: the installation must be designed, built, verified and maintained by a qualified professional, with single-line diagram, specifications, layout drawings and a load schedule.
  • Sizing: conductor cross-section by installation method, grouping and correction factors, voltage drop inside limits and short-circuit thermal stress verification.
  • Shock protection: automatic disconnection (fuse/breaker) plus 30 mA RCD mandatory for wet areas, bathrooms, kitchens, outdoor circuits and general-purpose socket outlets, per the standard rule.
  • Earthing and bonding: TN, TT or TN-C-S scheme defined in the design, continuous protective conductor, main and supplementary equipotential bonding (the item most often flagged in older buildings).
  • Initial verifications: PE continuity, insulation resistance, polarity, RCD trip test and circuit identification — the same tests that later become the table in the technical report.
02

NBR 5419 — Protection against atmospheric discharges (replaced NBR 5418)

Anyone asking for an "NBR 5418 report" is citing the obsolete lightning-rod standard: it was withdrawn and replaced by the NBR 5419 series (harmonized with IEC 62305). The 2026 edition cancelled the 2015 one and changed criteria that directly affect reports and re-inspection.

  • Risk analysis decides whether an LPS is mandatory — not comfort: the standard computes tolerable loss and sets the protection level (I to IV).
  • Inspection interval by risk (clause 7.3.2): every 1 year for high-risk structures (classified areas, explosive atmospheres, essential services, severe coastal or industrial corrosion) and every 3 years for all others.
  • Grounding efficacy changed (clause 7.1.4): the 2026 edition drops the old "must read under 10 Ω" verdict and now verifies electrical continuity with a milli-ohmmeter. A report based on the 2015 edition can be technically outdated even while still in date.
  • Direct strike, SPD operation, retrofit or repair are triggers: in those events the standard requires a new inspection before the periodic interval ends.
  • Report with ART and photo record: air-termination, down conductors, test connections, mesh, bonding and SPD condition — what fire marshals, city halls and insurers accept.
03

NR-10 — Safety in electrical installations and services

A Ministry of Labour regulation (CLT-based) covering anyone who interacts, directly or indirectly, with an electrical installation. The wording applied today remains in force until 31 May 2027; the fifth revision, Ordinance MTE 737 dated 29 May 2026, takes effect on 1 June 2027, with a specific term for existing installations.

  • Electrical installation register (item 10.2.4): mandatory for premises with installed load above 75 kW — designs, single-line diagrams, inspection reports, permits to work and training evidence.
  • De-energization is a procedure, not an intention: disconnection, prevention of re-energization (lockout/tagout), verification of absence of voltage, temporary equipotential bonding and signage.
  • Training and personnel classification: NR-10 course with the minimum hours set by the standard, refresher every two years, and the distinction between trained, qualified, skilled and authorized workers — only the authorized one intervenes.
  • Task risk analysis and written work procedure per installation, with control measures, PPE and collective protections inventoried and inspected.
  • Risk management aligned with NR-1 (GRO/PGR): the 2026 revision reinforces electrical risk inside the company risk inventory — those with a PGR must add electricity, those without must start with NR-10.

See the report that feeds the register

04

NR-35 — Work at height

Applies to any activity above 2 metres from the lower level with fall risk: roof, LPS mast, high bay lighting, gutters, solar array, busbar rack. In electrical work, NR-10 and NR-35 apply at the same time.

  • 8-hour initial training with practical exercise plus biennial reassessment, and fitness certified by a medical statement compatible with the task.
  • Risk analysis and permit to work (PT) before going up, with recorded and signed control measures.
  • Fall protection system: full-body harness, double lanyard with shock absorber, engineered anchorage point and life line — anchorage designed, never clipped to "whatever is there".
  • Supervision and no isolated work without communication: someone accountable for the operation and for rescue.
  • Emergency and rescue plan, including the suspended-worker scenario (suspension trauma) — and, with live conductors nearby, the NR-10 disconnection.
05

NBR 14039 — Medium-voltage installations (above 1 kV up to 36.2 kV)

The standard for the industrial power entry, transformer, switchgear cubicle and medium-voltage feeder. It shows up in the utility design, in commissioning and in the report that releases operation.

  • Design with protection coordination and selectivity: relays, fuses, reclosers coordinated so only the faulted section is isolated.
  • Insulation and clearances: withstand levels, minimum air distances, barriers and enclosures by voltage class.
  • Earthing and fault currents: fault-current calculation, surface potential gradient and human-safety criteria.
  • Commissioning and documented switching: insulation tests, turns ratio, relay functionality and recorded switching sequence.
  • The human side: only skilled, authorized personnel operate medium voltage, with arc-flash PPE and a written procedure (NR-10).
06

NBR 17019 — Electric vehicle charging infrastructure

A 2022 standard created because "anyhow" installed chargers became a real hazard. It governs the fixed charging point: circuit, protection, identification and safety, including condominiums.

  • Dedicated circuit with its own protection for each charging point, sized on the charger real current.
  • Surge protection (SPD) mandatory at the charging point — the item improvised installs almost never have.
  • Visible, identifiable disconnecting means next to the point, to cut power safely during maintenance or emergency.
  • Interface with NBR 5410: a charger is a new load, so demand, conductor size, panel and RCD must be re-evaluated.
  • Documentation and ART so the assembly, the insurer and the utility accept the installation.

See green energy and charging solutions

07

Law 5.194/1966 and CONFEA/CREA resolutions — who signs and with which document

The legal basis of the profession: it requires council registration and gives every technical work a named responsible person. This is what turns your design and your report into a valid document.

  • Professional registration at the CREA of the jurisdiction is what enables the technical lead to sign.
  • ART (Technical Responsibility Record) per work or service — design, execution, inspection, report and maintenance each need one.
  • Scope by level and modality (CONFEA Resolution 218/1991): check that the ART object matches the work you contracted.
  • Registered technical portfolio: the record that proves experience in audits, tenders and expert witness work.
  • Without ART the report is void: fire marshals, city halls, insurers and utilities may refuse an unregistered document.

See certifications and registrations

Quick table

What each document requires and who enforces it

Bring this table to the meeting with the building manager, the maintenance lead or occupational safety.
Document What it covers Who enforces Where it shows up
NBR 5410 Low-voltage installation, from design to verification Utility, fire marshal, auditors, courts Electrical design and installation report
NBR 5419 (ex-5418) LPS: risk analysis, air termination, down conductors, earthing, SPDs Fire department, insurers LPS report and AVCB renewal
NR-10 Worker safety in electrical services Labour inspectors, CIPA, SESMT Register, permits, training, report
NR-35 Work above 2 m with fall risk Labour inspectors, SESMT, contractors Roof, mast and high-lighting permits
NBR 14039 Medium voltage: supply entry, transformation, cubicles Utility, fire department, safety engineering MV design, commissioning report
NBR 17019 Electric vehicle charging infrastructure Condominium, insurer, utility Charging point design
Law 5.194/1966 + CONFEA Res. 218/1991 Professional registration, ART and scope CREA/CONFEA, public agencies ART attached to every design and report
NBR ISO/CIE 8995-1 Task-based illuminance (replaced the old NBR 5413) Ergonomics audits (NR-17), clients Lighting design
NBR 16690 Telecommunications infrastructure (SDI) Carriers, construction inspection Integrated electrical design
ANEEL Resolution 1.000/2024 Connection procedures and utility approval Distribution utility Generation and new-load approval
State Fire Department technical instructions (IT) State-level fire prevention and fighting requirements State fire department AVCB/CLCB and required reports

Technical instructions vary by state (São Paulo IT-08 is not Minas Gerais IT-08) and fire marshals, city halls or insurers may require a shorter interval than the standard — never a longer one. Before scheduling the inspection I confirm which document you must present and to whom.

Obligation in practice

Who needs what

The question I hear most is "is this mandatory for me?". Here is the honest answer: the obligation comes from use, load and who will read the document.

By client type

  • Industry above 75 kW installed load → NR-10 register (item 10.2.4), report with measurements, signed permits and documented training of whoever operates.
  • Building with an installed LPS → inspection every 1 year (high risk) or 3 years (others) per NBR 5419-3:2026, 7.3.2, plus extraordinary inspection after a strike, SPD operation or retrofit.
  • Retail and shopping centres → electrical and LPS reports for AVCB/CLCB, panel thermography and NBR 5410 compliance; insurers usually require a current report.
  • Condominium → design for new load (pump, lift, EV charger), report for AVCB renewal and a recorded assembly decision on what was approved.
  • New build or renovation → electrical design with ART, coordination with telecom (NBR 16690) and final verification before occupancy inspection.
  • Home with solar, an EV charger or an old panel → no inspector knocks at the door; the standard protects the resident, the asset and the insurance. Same low-voltage checklist applies.

Three documents that settle 80% of the requirements

Electrical design with ART; installation report (NBR 5410) with tests; LPS report (NBR 5419) with measured continuity. With those, everything else — register, technical instructions, utility approval — becomes paperwork rather than new works.

See report scopes

Method

How compliance is verified

Nothing is stated without a measurement. This is the field sequence.

Document triage

Design, previous ART, reports, AVCB, invoice and contracted power. I find out what the document has to prove before climbing on the roof.

1 day

NBR 5410 visual inspection

Panel, circuit identification, conductor size, RCD, PE, filling, conduit body condition and absence of improvised wiring.

on site

Instrumented tests

PE continuity, insulation resistance, RCD trip test, earth measurement and — for the LPS — electrical continuity with a milli-ohmmeter.

on site

Thermography under real load

Criticality ranking of hot points, with the current of each phase recorded at capture time.

on site

Report, non-conformities and ART

Every finding cites the standard clause, the risk, the recommended fix and the estimated cost. ART filed at CREA, delivered as PDF.

5 business days

Frequently asked questions

Which standards must an electrical design follow in Brazil?
The core is always the same: NBR 5410 for low voltage, NBR 14039 when medium voltage exists, NBR 5419 when the structure needs lightning protection, NBR 17019 if there is an EV charging point and NBR ISO/CIE 8995-1 for lighting. NR-10 is not a design standard but defines what the installation must allow in terms of worker safety, and Law 5.194/1966 with CONFEA resolutions defines who may sign. Approval adds the utility requirements (ANEEL Resolution 1.000/2024) and the state fire department technical instructions.
Is NBR 5418 still valid for the lightning report?
No. NBR 5418 was withdrawn and replaced by the NBR 5419 series (Structure protection against atmospheric discharges), harmonized with IEC 62305. The wording "NBR 5418 report" still lives in the vocabulary of many fire marshals, managers and insurers, but the technically correct document today is the NBR 5419 report — whose current edition is 2026, which cancelled the 2015 one. If your old report cites 5418, that is a sign it deserves a suitability review rather than a reissue.
What exactly changed in NBR 5419:2026 for someone holding an LPS report?
Three practical points. First: the inspection interval is now set by the risk of the structure (clause 7.3.2) — 1 year for high risk (classified areas, explosive atmospheres, essential services, severe corrosion) and 3 years otherwise, replacing the previous logic organised by protection level and inspection type. Second: grounding efficacy is no longer judged by a resistance value and is now verified by electrical continuity with a milli-ohmmeter (clause 7.1.4). Third: risk analysis gained weight and SPD/bonding verification became explicit. That is why a report issued under the previous edition can be technically outdated even while in date.
How long is an LPS report valid?
The standard does not stamp "expires in 12 months": it defines how often the inspection must happen, and that interval is the practical validity — 1 or 3 years depending on risk (NBR 5419-3:2026, 7.3.2). Beyond the period, renewal is triggered by events: a suspected direct strike, SPD operation, refurbishment, extension, change of use or any repair on the LPS itself. Five-year terms usually come from old readings or local demands. And note: the fire department, the city hall or the insurer may require a shorter interval than the standard — never a longer one.
When is my company required to keep the NR-10 register?
Item 10.2.4 of NR-10 requires the electrical installations register for premises with installed load above 75 kW. It gathers designs and single-line diagrams, inspection reports and technical reports, permits to work, intervention records and evidence of training and capacitation. Installations below 75 kW are not free of NR-10 — they are exempt from the register but still bound to control measures, de-energization, training and risk analysis.
Has NR-10 changed? Which wording should I apply now?
The wording applied today remains in force until 31 May 2027. The fifth revision was consolidated by Ordinance MTE 737, dated 29 May 2026, and takes effect on 1 June 2027, with a specific term for existing electrical installations. The axis of the change is occupational risk management integrated with the NR-1 structure (GRO/PGR). If you have an audit or a document renewal in this window, work to the current wording and map what changes in 2027 — especially risk documentation, work procedures and capacitation evidence.
Who may sign an electrical design and a technical report?
Law 5.194/1966 requires CREA registration to practise and sign, and CONFEA resolutions — Resolution 218/1991 in particular — distribute duties by level and professional modality. In practice, what gives the document value is: a registered professional, an ART filed at CREA with an object compatible with the work, and a declared scope. If you doubt the reach of a signature, verify the registration and the ART at the council before accepting the document.
Does the report lose value without an ART?
Yes. The ART is what turns a technical statement into a document with an identified legal responsible party. Without it, the fire department, the city hall, the insurer, a construction-financing bank and labour audits may refuse it. In a claim, the absence of ART is an easy argument to deny coverage. Every Energia Criativa design and report is delivered with a filed ART.
Does NR-35 apply to electrical work?
Whenever there is work above 2 metres from the lower level with fall risk: roof, LPS mast, gutter, high-bay lighting, solar structure, busbar rack. Then NR-10 and NR-35 apply together — de-energization, lockout and tagging on one side; anchorage, full-body harness with double lanyard and absorber, permit to work, supervision and rescue plan on the other. Initial 8-hour training with practice, biennial reassessment and a medical statement compatible with the task are mandatory.
Which standard governs solar arrays and EV chargers?
For vehicle charging, the specific reference is NBR 17019:2022, requiring a dedicated circuit, surge protection (SPD), an identifiable disconnect and documentation. For grid-connected solar, the installation enters through NBR 5410 (including DC requirements), ANEEL Resolution 1.000/2024 in the relationship with the distributor, an Inmetro-approved inverter and — with an LPS or a metal roof present — NBR 5419, with extraordinary inspection after the works. Roof penetrations and clamp feet silently invalidate a previous LPS report quite often.
Does breaching a technical standard create a fine?
An ABNT standard is not law by itself, but it becomes an enforceable requirement when a regulation, the municipal building code, a fire-department technical instruction or a regulatory norm invokes it. Under labour law, breaching an NR draws an infraction notice from a Labour Auditor and may lead to embargo or interdiction where there is serious and imminent risk. In civil and insurance terms, the costliest consequence is losing coverage and being liable for damage to third parties. That is why a report cites the clause: it is the link between the standard and the concrete demand.
How do I choose the right scope for a report?
First ask who will read the document and what that reader needs to find. The fire department wants LPS, panels and corrected non-conformities; the insurer wants preservation evidence and thermography; the labour auditor wants register, permits and training; the utility wants the service entrance and protection; the building manager wants an assembly decision and cost. Once the reader is defined, the scope gets the right size — and the report stops being decorative paper.
Do you work to my state specific fire-department requirement?
Yes. Fire-department technical instructions change from state to state, and for small buildings even between municipalities. Before closing the scope I ask for the applicable instruction or the last inspection notice and build the report against that requirement, not against a generic template.
Next step

Would your building pass the inspection against these standards?

Send me the requirement you received — a fire-department instruction, an auditor note, an insurer e-mail or a utility demand. I tell you what is mandatory, what is recommended and what it costs to fix, with the matching clause.