Industrial roof covered with photovoltaic panels at sunset

Green Energy

Clean generation costs less than keeping waste on the bill

Feasibility study, design and utility homologation for photovoltaic systems, EV chargers and incentivised generation — with payback proven in a spreadsheet before you buy anything.

Utility homologation included ESG-ready report

Organised industrial switchboard with labelled busbars and conductors

Electrical Design

A design the electrician understands and the utility approves

Low and medium voltage for industry, retail, condominiums and homes: single-line diagram, load schedule, bill of materials, written specification and earthing/lightning details.

Delivered as PDF + editable DWG Typical lead time: 7 to 15 days

Thermal camera aimed at an electrical panel showing a heat map

Technical Reports

The report that passes the fire marshal, the utility and the insurer

Inspection against NBR 5410, NBR 5419 lightning verification, thermography of critical circuits and a registered ART. Every non-conformity arrives with a priced fix and a deadline.

ART record included Photo-evidenced findings

Digital energy meter with a glowing downward trend line

Energy Savings

Every wasted kilowatt has a name, a circuit and a cost

Metered energy audit: power factor, phase balancing, on-peak windows, lighting and idle loads. You get the waste map and the price of every fix.

Typical cuts of 15% to 35% on lighting and power factor Payback calculated, never promised

Work desk with electrical drawings, a tablet showing a diagram and an LED-lit model

Creativity

Creative engineering for the problem the standard never anticipated

Architectural lighting design, environment automation, custom switchboards and solutions that save structure. A good idea is one that passes inspection and fits the budget.

Prototype and model before execution Constructive details drawn

01 / 05

The six commitments

One technician, six obsessions

I work on electrical design and technical reports across Brazil treating six themes as one service: saving, sustaining, creating, generating clean power, documenting and designing.

Economy

Every circuit is sized twice: once for the standard, once for the month-end electricity bill.

See energy savings

Sustainability

Lower demand, fewer discarded materials and indicators that drop straight into your ESG report.

See sustainability

Creativity

A good solution uses what is already there: lighting that adds value, automation that cuts waste.

See creative solutions

Green Energy

Photovoltaic, EV charging and incentivised generation, with a payback study before any purchase.

See green energy

Technical Reports

Reports with measurement, photo evidence, an ART record and a fix plan an electrician can actually execute.

See reports

Electrical Design

A complete design from the service entrance to the last outlet, ready to tender and to approve.

See designs

Energia Criativa by the numbers

480 + designs and reports signed
12 years in the field, low and medium voltage
26 states served
1.4 GWh annual savings forecast for clients

Consolidated portfolio figures. To show your own results, edit conteúdo/home.

Modernised industrial substation with switchgear and transformer NBR 5410 · NBR 14039
Electrical design

A design with no surprises on site

I start from real load, not from a table guess. The result is a design the electrician builds without phoning for clarification and an installation that passes inspection first time.

  • Single-line diagram, load schedule and circuit-by-circuit board
  • Conductor sizing, protection and discrimination
  • Bill of materials with real quantities — no cable padding
  • Earthing, lightning protection and surge protection drawn in detail
  • Written specification for tendering and utility approval
Technical inspection with thermographic camera on an electrical panel NR-10 · NR-35 where applicable
Technical reports

A report that opens doors, not one that stacks paper

Fire marshal, utility, insurer, a large client audit: each one wants a different document. I deliver the report with readings, photos, cited standards, the registered ART and a correction plan ranked by risk.

  • Visual inspection and tests: continuity, insulation, fault current
  • Thermography of critical circuits with a temperature report
  • Lightning protection and earthing verification per NBR 5419
  • Non-conformity list with deadline and estimated cost
  • ART issued and paperwork ready for filing
Average lead time: 5 business days Signed PDF report
Energy savings

Estimator: what is left on the bill if you cut the waste?

Drag the controls to see how a consumption cut lands on your tariff. An honest estimate: it shows the order of magnitude, not a promise.

12 kW
28 %

Educational estimate. The final figure depends on metering, tariff and consumption window.

Estimate

766 per month

per year: R$ 9.193

806 kWh kWh avoided/month
716,08 t CO₂ avoided
42.965 trees eq.
18 months Payback
Ground-mounted solar farm at sunrise CO₂ avoided measured in tonnes per year
Green energy and sustainability

Sustainability that closes in the budget

Distributed generation, efficiency and material reuse are not brochure talk: they are spreadsheets, metering and maintenance. I pick the solution that pays for itself and lowers emissions.

  • Photovoltaic feasibility study on a 25-year horizon
  • Reuse of boards, cables and luminaires during retrofit
  • Per-sector consumption indicators for ESG reporting
  • Daylighting and addressable LED with occupancy control
How the work happens

Four stages, no surprises

The same process applies to an 80 m² apartment and to a 5 MVA substation. Only the scale changes, not the method.

Listening and metering

Technical conversation, collection of plans, power bills and photos. Where possible, an on-site survey with instruments.

1 to 3 days

Study and proposal

Pre-sizing, savings scenario and a closed scope with timeline, deliverables and price.

3 days

Design execution

Drawing, calculation, specification and coordination with architecture and structure. You follow progress on WhatsApp.

7 to 15 days

Delivery and support

PDF + DWG, registered ART and site support until final utility or fire marshal approval.

continuous
Portfolio

Delivered work

A sample of the portfolio: industry, retail, condominium, residential, solar and public lighting. Open one to see scope, standard applied and measured result.

All projects

Certifications

Qualified to sign

Professional registration, safety training and technical courses reviewed on a schedule. The full list lives on the certifications page.

Professional registration as electrical technician

CREA-SP · Brazilian engineering council (Confea/Crea)

Standing authorisation to practise electrical technology, registered with the professional council and kept active since 2013. It is this registration that gives legal force to low and medium voltage installation designs and enables the electronic ART record for each signed job. The registration number and its status are printed on the proposal and can be verified in the council's public registry.

2013 CREA-SP · Professional Registration
Valid and active

NR-10 — basic safety training for electrical installations and services

Regulatory standard NR-10 · Brazilian Ministry of Labour

Initial 40-hour training on electrical risks, control measures, de-energisation with lock-out, controlled zones and the minimum documentation an installation must hold. The procedure taught there governs every surveyed test: dead, signed and blocked, with an RCD check before any board is opened.

2024 NR-10 Basic 40 h
Valid · refresher up to date

NR-10 — supplementary course for high and extra-high voltage work

NR-10 supplementary module · HV and EHV installations

Further training required for work on high and extra-high voltage installations: switching operations, clearances, protective equipment, safety roles and coordination with the utility delivery point. It underpins inspections of service entrances, switchgear cubicles and private substations.

2023 NR-10 Supplementary · HV/EHV 40 h
Valid · refresher up to date

All certifications

An ART record is issued for every design or report delivered, under CONFEA/CREA rules.

Testimonials

What clients received

The lightning protection report was accepted by the fire brigade first time. What stood out was the costed correction list: we knew exactly where to invest.
Marina Tavares, Engineer Maintenance manager · Packaging plant, Guarulhos/SP

Our board had mixed circuits since construction. The design reorganised it, metering showed the drop in common-area demand and cost splitting stopped being a fight.
Ricardo Alencar Building manager · Condominium in Curitiba/PR

I needed a design for licensing and ended up with lighting that upgraded the clinic. Remote service, deadline met, complete documentation.
Dr. Helena Braga Dental clinic · Belo Horizonte/MG

Illustrative testimonials of the kind of feedback received. Replace with your own in conteúdo/home.

Insights

From the board to the tariff, no mysticism

I write what I explain on site: what the standard demands, what the utility accepts and what lowers the bill.

All articles

Contact

Talk directly to the technical lead

No call centre: the person who answers is the person who signs the design.

For high-resolution plans and photos, Telegram is the fastest route.

Coverage

Designs and reports across Brazil

Based in São Paulo, working in every state. Digital design, scheduled site survey, ART issued nationwide.

São Paulo (SP)

São Paulo base Guarulhos site served Campinas scheduled visit São Bernardo do Campo Santos digital delivery Ribeirão Preto scheduled visit Sorocaba Jundiaí Bauru digital delivery São José dos Campos site served

Minas Gerais (MG)

Belo Horizonte site served Contagem Uberlândia scheduled visit Juiz de Fora Betim Montes Claros digital delivery Ouro Preto Divinópolis Ipatinga scheduled visit Varginha

Rio de Janeiro (RJ) and Espírito Santo (ES)

Rio de Janeiro site served Niterói Nova Iguaçu Campos dos Goytacazes scheduled visit Petrópolis Volta Redonda Macaé site served Vitória digital delivery Vila Velha Cachoeiro de Itapemirim

Paraná (PR)

Curitiba site served Londrina scheduled visit Maringá Ponta Grossa Cascavel Foz do Iguaçu digital delivery São José dos Pinhais Paranaguá Francisco Beltrão

Rio Grande do Sul (RS)

Porto Alegre site served Caxias do Sul scheduled visit Canoas Pelotas Santa Maria digital delivery Novo Hamburgo Passo Fundo Rio Grande scheduled visit Gravataí

Santa Catarina (SC)

Florianópolis site served Joinville Blumenau scheduled visit Itajaí Criciúba digital delivery Chapecó

Goiás (GO), Federal District (DF), Mato Grosso do Sul (MS) and Mato Grosso (MT)

Brasília site served Goiânia scheduled visit Anápolis Rio Verde Campo Grande digital delivery Cuiabá

Bahia (BA) and Sergipe (SE)

Salvador site served Feira de Santana Camaçari scheduled visit Ilhéus Vitória da Conquista Aracaju digital delivery

Pernambuco (PE), Ceará (CE) and Paraíba (PB)

Recife site served Olinda Petrolina scheduled visit Fortaleza Caucaia digital delivery João Pessoa

Amazonas (AM), Pará (PA), Rondônia (RO), Tocantins (TO) and Roraima (RR)

Manaus site served Belém Marabá scheduled visit Porto Velho Palmas digital delivery Boa Vista

Your city missing? Send a WhatsApp: I take on new locations subject to date availability.

Frequently asked questions

Do you work outside São Paulo?
Yes. The design is developed entirely in a digital environment and the technical survey is scheduled on an agreed date anywhere in Brazil. The ART is issued for the site location.
How much does an electrical design cost?
Price depends on floor area, installed load and the level of detail the utility requires. Either way the proposal is fixed by scope, never hourly. Use the [quote page](orcamento) to get a number within 4 business hours.
Is a technical report mandatory?
For AVCB renewal, financing, insurance audit, a utility requirement or commercial leasing, almost always. The concrete need comes from the body requesting the document — that is what I establish before quoting.
How fast do I get the report?
Average is 5 business days after the survey for installation and lightning protection reports of small and medium size. Thermography beyond 200 circuits can take up to 10 business days.
Will the design be approved by the utility?
The design follows the technical standards and the requirements of the local distributor access group. I deliver the paperwork organised for filing and adjust whatever the utility requests at no extra cost.
Do you work in AutoCAD, Revit or another software?
Delivery is a stamped PDF plus editable DWG. BIM coordination (Revit) is an additional scope when the project requires it.
WhatsApp Telegram Send e-mail Quote