Clean generation costs less than keeping waste on the bill
Feasibility study, design and utility homologation for photovoltaic systems, EV chargers and incentivised generation — with payback proven in a spreadsheet before you buy anything.
A design the electrician understands and the utility approves
Low and medium voltage for industry, retail, condominiums and homes: single-line diagram, load schedule, bill of materials, written specification and earthing/lightning details.
Delivered as PDF + editable DWGTypical lead time: 7 to 15 days
Technical Reports
The report that passes the fire marshal, the utility and the insurer
Inspection against NBR 5410, NBR 5419 lightning verification, thermography of critical circuits and a registered ART. Every non-conformity arrives with a priced fix and a deadline.
Typical cuts of 15% to 35% on lighting and power factorPayback calculated, never promised
Creativity
Creative engineering for the problem the standard never anticipated
Architectural lighting design, environment automation, custom switchboards and solutions that save structure. A good idea is one that passes inspection and fits the budget.
Prototype and model before executionConstructive details drawn
01 / 05
The six commitments
One technician, six obsessions
I work on electrical design and technical reports across Brazil treating six themes as one service: saving, sustaining, creating, generating clean power, documenting and designing.
Economy
Every circuit is sized twice: once for the standard, once for the month-end electricity bill.
Consolidated portfolio figures. To show your own results, edit conteúdo/home.
NBR 5410 · NBR 14039
Electrical design
A design with no surprises on site
I start from real load, not from a table guess. The result is a design the electrician builds without phoning for clarification and an installation that passes inspection first time.
Single-line diagram, load schedule and circuit-by-circuit board
Conductor sizing, protection and discrimination
Bill of materials with real quantities — no cable padding
Earthing, lightning protection and surge protection drawn in detail
Written specification for tendering and utility approval
A report that opens doors, not one that stacks paper
Fire marshal, utility, insurer, a large client audit: each one wants a different document. I deliver the report with readings, photos, cited standards, the registered ART and a correction plan ranked by risk.
Visual inspection and tests: continuity, insulation, fault current
Thermography of critical circuits with a temperature report
Lightning protection and earthing verification per NBR 5419
Non-conformity list with deadline and estimated cost
ART issued and paperwork ready for filing
Average lead time: 5 business daysSigned PDF report
Distributed generation, efficiency and material reuse are not brochure talk: they are spreadsheets, metering and maintenance. I pick the solution that pays for itself and lowers emissions.
Photovoltaic feasibility study on a 25-year horizon
Reuse of boards, cables and luminaires during retrofit
Per-sector consumption indicators for ESG reporting
Daylighting and addressable LED with occupancy control
The same process applies to an 80 m² apartment and to a 5 MVA substation. Only the scale changes, not the method.
Listening and metering
Technical conversation, collection of plans, power bills and photos. Where possible, an on-site survey with instruments.
1 to 3 days
Study and proposal
Pre-sizing, savings scenario and a closed scope with timeline, deliverables and price.
3 days
Design execution
Drawing, calculation, specification and coordination with architecture and structure. You follow progress on WhatsApp.
7 to 15 days
Delivery and support
PDF + DWG, registered ART and site support until final utility or fire marshal approval.
continuous
Portfolio
Delivered work
A sample of the portfolio: industry, retail, condominium, residential, solar and public lighting. Open one to see scope, standard applied and measured result.
Professional registration, safety training and technical courses reviewed on a schedule. The full list lives on the certifications page.
Professional registration as electrical technician
CREA-SP · Brazilian engineering council (Confea/Crea)
Standing authorisation to practise electrical technology, registered with the professional council and kept active since 2013. It is this registration that gives legal force to low and medium voltage installation designs and enables the electronic ART record for each signed job. The registration number and its status are printed on the proposal and can be verified in the council's public registry.
2013CREA-SP · Professional Registration
Valid and active
NR-10 — basic safety training for electrical installations and services
Regulatory standard NR-10 · Brazilian Ministry of Labour
Initial 40-hour training on electrical risks, control measures, de-energisation with lock-out, controlled zones and the minimum documentation an installation must hold. The procedure taught there governs every surveyed test: dead, signed and blocked, with an RCD check before any board is opened.
2024NR-10 Basic40 h
Valid · refresher up to date
NR-10 — supplementary course for high and extra-high voltage work
NR-10 supplementary module · HV and EHV installations
Further training required for work on high and extra-high voltage installations: switching operations, clearances, protective equipment, safety roles and coordination with the utility delivery point. It underpins inspections of service entrances, switchgear cubicles and private substations.
An ART record is issued for every design or report delivered, under CONFEA/CREA rules.
Testimonials
What clients received
The lightning protection report was accepted by the fire brigade first time. What stood out was the costed correction list: we knew exactly where to invest.
Our board had mixed circuits since construction. The design reorganised it, metering showed the drop in common-area demand and cost splitting stopped being a fight.
Ricardo AlencarBuilding manager · Condominium in Curitiba/PR
I needed a design for licensing and ended up with lighting that upgraded the clinic. Remote service, deadline met, complete documentation.
Dr. Helena BragaDental clinic · Belo Horizonte/MG
Illustrative testimonials of the kind of feedback received. Replace with your own in conteúdo/home.
Insights
From the board to the tariff, no mysticism
I write what I explain on site: what the standard demands, what the utility accepts and what lowers the bill.
Energy audit with network analyser, sub-metering and thermography: where power disappears in a plant, how to split demand from consumption, and honest…
Load forecast, conductors, discrimination, power factor, phases, dedicated circuits and lighting: what to lock in now so the tariff does not punish yo…
For high-resolution plans and photos, Telegram is the fastest route.
Coverage
Designs and reports across Brazil
Based in São Paulo, working in every state. Digital design, scheduled site survey, ART issued nationwide.
São Paulo (SP)
São Paulo base
Guarulhos site served
Campinas scheduled visit
São Bernardo do Campo
Santos digital delivery
Ribeirão Preto scheduled visit
Sorocaba
Jundiaí
Bauru digital delivery
São José dos Campos site served
Minas Gerais (MG)
Belo Horizonte site served
Contagem
Uberlândia scheduled visit
Juiz de Fora
Betim
Montes Claros digital delivery
Ouro Preto
Divinópolis
Ipatinga scheduled visit
Varginha
Rio de Janeiro (RJ) and Espírito Santo (ES)
Rio de Janeiro site served
Niterói
Nova Iguaçu
Campos dos Goytacazes scheduled visit
Petrópolis
Volta Redonda
Macaé site served
Vitória digital delivery
Vila Velha
Cachoeiro de Itapemirim
Paraná (PR)
Curitiba site served
Londrina scheduled visit
Maringá
Ponta Grossa
Cascavel
Foz do Iguaçu digital delivery
São José dos Pinhais
Paranaguá
Francisco Beltrão
Rio Grande do Sul (RS)
Porto Alegre site served
Caxias do Sul scheduled visit
Canoas
Pelotas
Santa Maria digital delivery
Novo Hamburgo
Passo Fundo
Rio Grande scheduled visit
Gravataí
Santa Catarina (SC)
Florianópolis site served
Joinville
Blumenau scheduled visit
Itajaí
Criciúba digital delivery
Chapecó
Goiás (GO), Federal District (DF), Mato Grosso do Sul (MS) and Mato Grosso (MT)
Brasília site served
Goiânia scheduled visit
Anápolis
Rio Verde
Campo Grande digital delivery
Cuiabá
Bahia (BA) and Sergipe (SE)
Salvador site served
Feira de Santana
Camaçari scheduled visit
Ilhéus
Vitória da Conquista
Aracaju digital delivery
Pernambuco (PE), Ceará (CE) and Paraíba (PB)
Recife site served
Olinda
Petrolina scheduled visit
Fortaleza
Caucaia digital delivery
João Pessoa
Manaus site served
Belém
Marabá scheduled visit
Porto Velho
Palmas digital delivery
Boa Vista
Your city missing? Send a WhatsApp: I take on new locations subject to date availability.
Frequently asked questions
Do you work outside São Paulo?
Yes. The design is developed entirely in a digital environment and the technical survey is scheduled on an agreed date anywhere in Brazil. The ART is issued for the site location.
How much does an electrical design cost?
Price depends on floor area, installed load and the level of detail the utility requires. Either way the proposal is fixed by scope, never hourly. Use the [quote page](orcamento) to get a number within 4 business hours.
Is a technical report mandatory?
For AVCB renewal, financing, insurance audit, a utility requirement or commercial leasing, almost always. The concrete need comes from the body requesting the document — that is what I establish before quoting.
How fast do I get the report?
Average is 5 business days after the survey for installation and lightning protection reports of small and medium size. Thermography beyond 200 circuits can take up to 10 business days.
Will the design be approved by the utility?
The design follows the technical standards and the requirements of the local distributor access group. I deliver the paperwork organised for filing and adjust whatever the utility requests at no extra cost.
Do you work in AutoCAD, Revit or another software?
Delivery is a stamped PDF plus editable DWG. BIM coordination (Revit) is an additional scope when the project requires it.