Substation upgrade and new main switchboard for a packaging plant
A plant in Guarulhos ran its 1994 substation with no discrimination and no earthing record. I redrew the single-line diagram, the me…
- Ano2025
- Escoposurvey + design
- Entrega23 days
A provider in Porto Alegre needed 96 new outlets without stopping the existing room. I separated power from data, added a dedicated distribution board and certified every link before handing over the keys.
Within 420 m² four generations of installation lived together: a 1998 board feeding improvised rack outlets, data cables crossing the power tray, and two UPS units with expired batteries the operations team already treated as decoration. Every new asset came in through a tap-off, never through a design — and the label tags had more splices than numbers.
A plant in Guarulhos ran its 1994 substation with no discrimination and no earthing record. I redrew the single-line diagram, the me…
A 1,850 m² store in Brasilia replaced burnt luminaires like-for-like. I mapped the real illuminance of each sales zone and redesigne…
A Curitiba condominium approved 48 bays with chargers and the substation could not follow. I ran the load study with the building ma…